Mumbai Metro Map 2026: All Operational Lines, Stations, Fares, Timings and Upcoming Lines
Checked against official government sources. General information, not legal or financial advice.

The Mumbai Metro map in November 2026 has six operational lines: Line 1 (Blue), Line 2A (Yellow), Line 2B (Yellow, first section), Line 3 (Aqua), Line 7 (Red) and Line 9 (Red, first section). Together they cover more than 100 km, one of the largest metro networks in India. This guide covers each line, interchanges, fares, timings, upcoming lines and what metro access means for buyers and tenants.
- Operational lines: 1, 2A, 2B (Mandale to Chembur), 3, 7 and 9 (Dahisar East to Kashigaon)
- Network: more than 100 km, as announced by MMRDA in April 2026
- Longest line: Aqua Line 3, Aarey JVLR to Cuffe Parade, 33.5 km, 27 stations, fully open since 9 October 2025
- Operators: MMOPL (Line 1), MMMOCL (Lines 2A, 2B, 7, 9), MMRCL (Line 3)
- Fares: from ₹10; up to ₹70 on Line 3
- Tickets: QR tickets on the Mumbai One app and other apps, WhatsApp tickets, cards and counters
- Next openings: Line 4 (Gaimukh to Cadbury Junction) and Line 9 Phase 2, both targeted for December 2026
In this guide
Mumbai Metro lines in operation (November 2026)
| Line and colour | Route | Length | Operator | Opened |
|---|---|---|---|---|
| Line 1 (Blue) | Versova – Andheri – Ghatkopar | 11.4 km, 12 stations | Mumbai Metro One Pvt Ltd (MMOPL) | June 2014 |
| Line 2A (Yellow) | Andheri West (DN Nagar) – Dahisar East | 18.6 km, 17 stations | Maha Mumbai Metro Operation Corporation (MMMOCL) | 2022–2023 |
| Line 7 (Red) | Gundavali (Andheri East) – Dahisar East | 16.5 km | MMMOCL | 2022–2023 |
| Line 9 (Red), Phase 1 | Dahisar East – Pandurangwadi – Miragaon – Kashigaon | About 5 km, 4 stations | MMMOCL | 8 April 2026 |
| Line 2B (Yellow), Phase 1 | Mandale – Mankhurd – Diamond Garden – Chembur | 6 stations | MMMOCL | 8 April 2026; Chembur added August 2026 |
| Line 3 (Aqua) | Aarey JVLR – BKC – Worli – Cuffe Parade | 33.5 km, 27 stations | Mumbai Metro Rail Corporation (MMRCL) | October 2024 to October 2025 |
Line 7 and Line 9 now run as one Red Line from Gundavali to Kashigaon (19.79 km), so you can ride from Andheri East to Mira Road without changing trains. Line 2A runs on its own between Andheri West and Dahisar East.
Aqua Line 3 is Mumbai’s first fully underground metro. It opened in three stages: Aarey JVLR to BKC in October 2024, BKC to Worli (Acharya Atre Chowk) in May 2025, and Worli to Cuffe Parade on 9 October 2025. MMRCL owns it, and the Delhi Metro Rail Corporation runs it under contract. Key stops include SEEPZ, both airport terminals, BKC, Dadar, Churchgate and CSMT.
Key interchange stations
- Dahisar East: change between Line 2A and the Red Line (Lines 7 and 9) without leaving the paid area.
- DN Nagar: Line 1 and Line 2A.
- Marol Naka: Line 1 and Aqua Line 3.
- Chembur: Line 2B, the Harbour Line station (about 200 m) and the V N Purav Marg monorail station (about 100 m).
- Aqua Line rail links: Churchgate, Mumbai Central, Mahalaxmi, Dadar and CSMT connect with suburban and long-distance trains.
Fares and tickets
- Line 1: ₹10 to ₹40.
- Line 3: ₹10 to ₹70 for the full line.
- Lines 2A, 7 and 9: from ₹10. Gundavali to Kashigaon costs ₹50 and Dahisar East to Kashigaon ₹20.
- Mumbai One app: launched on 9 October 2025. One QR ticket works across the metro lines, monorail, suburban trains and the BEST, TMT, MBMT, KDMT and NMMT buses, with no extra platform fee.
- Other ways to pay: QR tickets on more than 14 apps through ONDC, WhatsApp tickets on Lines 2A and 7 (send “Hi” to 86526 35500), the MetroConnect3 app for Line 3, and counters at every station.
- Mumbai 1 card (Lines 2A and 7): 5% off from Monday to Saturday and 10% off on Sundays and national holidays. Senior citizens, persons with disability and students up to Class 12 get 25% off with valid documents.
A fare fixation committee has been proposed and may revise fares on Lines 2A and 7. Check the current fare before you travel.
Metro timings and frequency
| Line | First train | Last train | Peak frequency |
|---|---|---|---|
| Line 2A | 5:50 AM | About 11 PM | About 6 minutes |
| Lines 7 and 9 (Red Line) | 5:50 AM | 11 PM | Under 6 minutes |
| Line 2B | 6 AM | About 10:30 PM | About 9.5 minutes |
| Line 3 (Aqua) | 5:55 AM | 10:30 PM departure | About 5 minutes |
| Line 1 | About 5:30 AM | Late evening | Check MMOPL |
Timings can change on holidays. Check the operator’s app for the day’s schedule.
Metro lines under construction and expected dates
| Line | Route | Latest reported target |
|---|---|---|
| Line 4 and 4A (Green) | Wadala – Thane – Kasarvadavali – Gaimukh, 35.2 km, 32 stations | First 10.5 km (Gaimukh to Cadbury Junction, 10 stations) in December 2026; the rest later |
| Line 9 Phase 2 (Red) | Kashigaon to Subhash Chandra Bose Stadium, Bhayandar, 4 stations | December 2026, after the safety inspection |
| Line 2B (Yellow), rest | Chembur – BKC – Saraswat Nagar – DN Nagar | 2027 onwards, in stages |
| Line 6 (Pink) | Swami Samarth Nagar (Lokhandwala) – Vikhroli, 15.3 km, 13 stations | 2027; land issues have slowed some sections |
| Line 7A (Red) | Gundavali to CSMIA Terminal 2 | 2027 |
| Line 5 (Orange) | Thane – Bhiwandi – Kalyan | Thane to Bhiwandi first; no firm date |
| Line 12 (Orange) | Kalyan – Taloja | Early stage of work |
Metro dates in Mumbai have slipped many times. Treat every target date as an estimate until the safety commissioner clears the line.
Navi Mumbai has its own metro, built by CIDCO: Belapur to Pendhar, about 11 km with 11 stations, open since November 2023.
What metro access means for buyers and tenants
- Walking distance matters most. Homes within a 10-minute walk of a station usually rent faster. Beyond that, the benefit fades quickly.
- Prices near open lines already include the metro. Compare the rate per sq ft with streets one or two km away before you pay extra.
- Upcoming lines carry risk. In Thane, Bhayandar or along the rest of Line 2B, buy on today’s facts.
- Noise and construction. Flats facing an elevated track can be noisy. Visit at peak hours.
- Tenants: add the monthly metro fare to the rent when you compare homes.
- Before you buy: check the ready reckoner rate, the MahaRERA registration of the project and the occupancy certificate.
Read our guides to the ready reckoner rate in Mumbai, Mumbai property investment in 2026, Navi Mumbai real estate and the occupancy certificate. For other cities, see the Delhi Metro map and Lucknow Metro.
Frequently asked questions
How many metro lines are operational in Mumbai?
Six as of November 2026: Line 1, Line 2A, Line 2B (Mandale to Chembur), Line 3 (Aqua), Line 7 and Line 9 (Dahisar East to Kashigaon). Together they cover more than 100 km.
Is Mumbai Metro Line 3 fully open?
Yes. The full 33.5 km Aqua Line from Aarey JVLR to Cuffe Parade, with 27 stations, has been open since 9 October 2025.
Which metro line goes to Mumbai airport?
Aqua Line 3 has stations at both terminals of Chhatrapati Shivaji Maharaj International Airport. Line 7A, which will link Line 7 to Terminal 2, is under construction.
What is the Mumbai Metro fare?
Fares start at ₹10. The maximum is ₹40 on Line 1 and ₹70 on Line 3. Gundavali to Kashigaon on the Red Line costs ₹50.
Can I use one ticket for all Mumbai Metro lines?
Yes. The Mumbai One app gives one QR ticket that works across metro lines, the monorail, suburban trains and several bus services.
When will the Thane metro (Line 4) open?
The first 10.5 km stretch from Gaimukh to Cadbury Junction was targeted for December 2026 in the latest reports. The full Wadala to Gaimukh line will open later in stages.
Does Mumbai Metro reach Mira-Bhayandar?
Yes. Line 9 has run from Dahisar East to Kashigaon in Mira Road since 8 April 2026. Phase 2, to Subhash Chandra Bose Stadium in Bhayandar, is expected around December 2026.
Metro routes, fares, timings and opening dates are set by MMRDA, MMMOCL, MMRCL, MMOPL and the Government of Maharashtra and can change. Check the latest details with the operator before you travel or make a property decision. This guide is general information, not investment advice. Sources: MMRDA timetable and opening announcements (April 2026); MMMOCL fare products; Mumbai Metro Rail Corporation; Mumbai One app launch (October 2025); 2025–2026 reports on Lines 2B, 3, 4, 6 and 9.
Related guides
City & Locality GuidesMHADA Lottery 2026: Latest Draws, Income Limits, Eligibility, How to Apply and Check Results
City & Locality GuidesBangalore Metro Map 2026: Namma Metro Purple, Green, Yellow and Pink Lines, Fares, Timings and Upcoming Phases
City & Locality GuidesDelhi Metro Map: All Lines, Stations, Fare, Timings and Phase 4 StatusNew properties in Lucknow
₹3.27 croreEkana Ontario Duplex ApartmentGomti Nagar Ext., Lucknow
₹1.31 croreArdia Neo Downtown LucknowGomti Nagar Ext., Lucknow