Silk Board Metro Station: Yellow Line, Exits, Timings, Nearby Areas
Checked against official government sources. General information, not legal or financial advice.

Silk Board metro station, officially Central Silk Board, is an elevated station on the Yellow Line of Bengaluru’s Namma Metro, built right above the busy Silk Board junction where Hosur Road meets the Outer Ring Road. It opened with the Yellow Line in August 2025 and will also become the starting point of the Blue Line along the Outer Ring Road towards KR Puram and the airport. This guide covers platforms, exits, fares, timings, nearby areas and checks before you rent or buy.
- Line: Yellow Line (RV Road to Delta Electronics Bommasandra), run by BMRCL
- Type: elevated; station code listed as SBJT
- Opened: inaugurated 10 August 2025; passenger service from 11 August 2025
- Next stations: BTM Layout towards RV Road, Bommanahalli towards Bommasandra
- Future interchange: Blue Line (Silk Board to KR Puram and the airport), now expected in 2027
- Fare: Namma Metro fares are ₹10 to ₹90 by distance
- Parking: two-wheelers only, as listed
In this guide
The Yellow Line and where Silk Board sits
The Yellow Line is about 19 km long with 16 elevated stations. It runs from RV Road (Rashtreeya Vidyalaya Road) in Jayanagar, past BTM Layout and Silk Board, down Hosur Road through Electronic City to Bommasandra. Silk Board is the fifth station from RV Road.
| Platform | Trains towards | Next station |
|---|---|---|
| 1 | RV Road | BTM Layout |
| 2 | Delta Electronics Bommasandra | Bommanahalli |
Extra tracks and platforms for the Blue Line are built in but not yet in use.
The double-decker flyover at Silk Board
The stretch from Ragigudda to Silk Board is Bengaluru’s first double-decker flyover. Metro trains run on the upper deck and road traffic uses the lower deck. The road loops towards BTM Layout, HSR Layout and Hosur Road opened in stages from mid-2024, and the last two loops were reported as fully open in April 2026.
⌂Looking for a property?See homes, plots and shops listed by owners and agents.BrowseExits at Silk Board metro station
Public station guides list three entry and exit points. All are listed as wheelchair accessible.
| Exit | Leads towards (as listed) |
|---|---|
| A | Central Silk Board side |
| B | Textile Testing Lab side |
| C | Central Silk Board Colony side |
Gates can be closed for works or crowd control, especially while the Blue Line is being built. Follow the signs inside the station.
Fares, tickets and timings
- Fare: Namma Metro fares are ₹10 to ₹90, based on distance, under the revision of February 2025. A 5% hike planned from 9 February 2026 was put on hold, and reports in July 2026 said no 2026 increase had taken effect.
- End to end: the full RV Road–Bommasandra trip was priced at ₹60 at opening, as reported.
- Tickets: buy QR tickets on the official Namma Metro app, at ticket machines or at the counter. A Namma Metro smart card gives a discount on each trip.
- Timings: reports in 2026 put Yellow Line services at roughly 5 AM to 11 PM on weekdays, with a later start on Sundays. First and last trains differ by direction and day, so check the Namma Metro app.
- Frequency: trains ran every 25 minutes at launch. As more trains joined, peak gaps were reported at about 7 minutes in 2026, with BMRCL aiming to cut this further once all trains are in service.
How to reach other lines from Silk Board
- Green Line: ride north to RV Road (four stops) and change for Jayanagar, Majestic, Yeshwanthpur and Madavara.
- Purple Line: change to the Green Line at RV Road, then change again at Majestic (Nadaprabhu Kempegowda station) for MG Road, Indiranagar and Whitefield.
- Pink Line: the elevated Kalena Agrahara–Tavarekere section is scheduled to open on 13 November 2026, as reported. It meets the Yellow Line at Jayadeva Hospital, two stops north of Silk Board.
- Blue Line: once open, you will change at Silk Board itself for HSR Layout, the Outer Ring Road tech parks and KR Puram. Reports in August 2026 said the Silk Board–KR Puram section is likely to open only in 2027.
A 250 m walkway with a travelator was announced in 2024 to link the Yellow and Blue Line stations at Silk Board.
Nearby landmarks
- Central Silk Board office and junction: the station’s namesake.
- Hosur Road and the Electronic City Elevated Expressway: the road link south to Electronic City and Hosur.
- Outer Ring Road: the IT corridor towards HSR Layout, Agara, Bellandur and Marathahalli.
Homes and offices near Silk Board metro
Silk Board sits where several of south Bengaluru’s busiest residential and office areas meet.
- BTM Layout: dense housing, rooms and PGs, with its own Yellow Line station one stop north.
- HSR Layout: planned layout with independent houses, apartments and startup offices; the Blue Line will add a station here.
- Madiwala and Koramangala: older mixed areas with shops, offices and rental flats.
- Bommanahalli and Hongasandra: along Hosur Road, with apartments and smaller rental homes, served by the next Yellow Line stations.
The Yellow Line links this area directly to Electronic City, so many tenants here work on the Hosur Road or Outer Ring Road side. Rents and prices vary a lot by building and road, so compare a few homes before you decide.
Before you rent or buy near Silk Board
- Check the guideline value. Stamp duty in Karnataka is charged on the deal value or the guideline value, whichever is higher.
- Check the property tax record. This area was under BBMP, which the Greater Bengaluru Authority (GBA) and its city corporations took over in 2025. Ask the owner for the latest paid tax receipt and khata.
- Check RERA for new projects. Look up the project on the Karnataka RERA website before you book.
- Check the documents. Ask for the title chain, encumbrance certificate, approved plan and occupancy certificate.
- Expect construction nearby. Blue Line and road works around the junction may continue into 2027. Visit at peak hours to judge noise, dust and access.
- Put the lease in writing. Sign a rent agreement with the rent, deposit, notice period and maintenance clearly listed.
Read our guides to the Bangalore metro map, guideline value in Bangalore, stamp duty in Karnataka, BBMP property tax, Karnataka RERA, the occupancy certificate, the rent agreement format and checking property documents before buying. Further down the Yellow Line, see our Electronic City metro station and Bommasandra metro station guides.
Frequently asked questions
Which line is Silk Board metro station on?
It is on the Yellow Line of Namma Metro, which runs from RV Road to Delta Electronics Bommasandra. The official station name is Central Silk Board.
When did Silk Board metro station open?
The Yellow Line was inaugurated on 10 August 2025, and passenger trains started on 11 August 2025.
Is Silk Board an interchange station?
Not yet. It is planned as the interchange with the Blue Line along the Outer Ring Road to KR Puram and the airport. Reports in August 2026 said that section is likely to open in 2027.
How do I go from Silk Board to Electronic City by metro?
Take a train from Platform 2 towards Delta Electronics Bommasandra. Electronic City station is seven stops south, after Beratena Agrahara.
How do I reach Majestic from Silk Board?
Ride the Yellow Line north to RV Road and change to the Green Line towards Madavara. Majestic (Nadaprabhu Kempegowda station) is on the Green Line.
Is there parking at Silk Board metro station?
Public station guides list two-wheeler parking only. Plan to arrive on foot, by bus or by auto if you come by car.
What is the metro fare from Silk Board?
Namma Metro fares are ₹10 to ₹90 by distance. A planned 5% hike from February 2026 was put on hold, so check the exact fare on the Namma Metro app.
Platforms, exits, timings, frequency and fares are set by Bangalore Metro Rail Corporation Limited (BMRCL) and can change. Check the BMRCL website or the Namma Metro app before you travel, and check the latest guideline value, tax record, RERA record and documents before any property decision. This guide is general information, not investment advice. Sources: Bangalore Metro Rail Corporation Limited (bmrc.co.in); reports on the Yellow Line opening (August 2025), train additions and frequency (2025–2026), the February 2026 fare revision being put on hold, the Silk Board double-decker flyover (April 2026), the Blue Line timeline (August 2026) and the Pink Line opening (November 2026); public station guides for Central Silk Board.
Related guides
City & Locality GuidesNagar Nigam Guide: Meaning, Services and Official City Websites
City & Locality GuidesHMDA Hyderabad 2026: Jurisdiction, Layout Approval, LRS and Auctions
City & Locality GuidesCMDA Chennai 2026: Planning Permission, Approved Layouts and ExpansionNew properties in Lucknow
₹3.27 croreEkana Ontario Duplex ApartmentGomti Nagar Ext., Lucknow
₹1.31 croreArdia Neo Downtown LucknowGomti Nagar Ext., Lucknow




