Madavara Metro Station: Green Line Terminal, Timings, BIEC, Areas
Checked against official government sources. General information, not legal or financial advice.

Madavara metro station is the elevated northern terminal of the Green Line of Bengaluru’s Namma Metro, on Tumakuru Road next to the Bangalore International Exhibition Centre (BIEC). It opened for passengers on 7 November 2024, when the line was extended from Nagasandra, and it was earlier planned under the name BIEC. This guide covers its platforms, fares, timings, nearby landmarks, the proposed metro link to Tumakuru, and what to check before you rent or buy in the area.
- Line: Green Line (Madavara to Silk Institute), run by BMRCL
- Type: elevated terminal, two side platforms; station code BIET
- Opened: commercial service from 7 November 2024
- Next station: Chikkabidarakallu, towards Silk Institute
- Landmark: Bangalore International Exhibition Centre (BIEC), Tumakuru Road
- Fare: ₹10 to ₹90 on Namma Metro; the 5% hike planned for February 2026 is on hold
- Future: a 60 km Madavara–Tumakuru metro DPR was submitted in May 2026 (as reported)
In this guide
Line and platforms at Madavara
The Green Line is Bengaluru’s north–south line. It runs about 33.5 km from Madavara in the north-west to Silk Institute on Kanakapura Road, through Yeshwanthpur, Majestic, Jayanagar and Banashankari. Madavara is the last station at the northern end, so every train from here runs towards Silk Institute.
| Platform | Use | Next station |
|---|---|---|
| 1 | Arrivals from the south (terminus) | – |
| 2 | Trains towards Silk Institute | Chikkabidarakallu |
Heading south, trains run through Chikkabidarakallu, Manjunathanagar, Nagasandra, Dasarahalli, Jalahalli, Peenya and Yeshwanthpur before reaching Majestic. Platform use can change during works, so check the display boards before you board.
The Nagasandra–Madavara extension
- Length and stations: about 3.14 km with three new stations: Manjunathanagar, Chikkabidarakallu and Madavara.
- Cost: reported at ₹1,168 crore.
- Trial run: 6 August 2024.
- Opening: commercial service began on 7 November 2024, without a formal inauguration ceremony.
- Before this: Nagasandra was the northern end of the Green Line, and people around BIEC and Madanayakanahalli had to travel there by road.
Exits, parking and getting around
The station is in Madavara (PIN 560073), on the Tumakuru Road side next to BIEC. Exit names and parking details have not been confirmed in official sources, so follow the signboards at the station and ask the station staff about parking before you drive in. The station lies close to the point where NICE Road meets Tumakuru Road, which makes it reachable from both the city side and the Nelamangala side. Autos, cabs and buses run along Tumakuru Road.
Fares, tickets and timings
- Fare: Namma Metro fares are ₹10 to ₹90 by distance, after the February 2025 revision. BMRCL announced a 5% rise (to ₹11 to ₹95) from 9 February 2026 but put it on hold the day before. In July 2026, reports said BMRCL was studying a 12% revision once every three years instead; no new fare has been notified.
- Tickets: buy QR tickets on the official Namma Metro app or WhatsApp ticketing, at ticket machines or at the counter.
- Cards: a Namma Metro smart card or NCMC card gives a discount on each trip.
- Timings: when the stretch opened, BMRCL said the first train would leave Madavara at 5 AM and the last at 11 PM, with trains about every 10 minutes on this section. Sunday services start later. Check the Namma Metro app for the current timetable.
How to reach other lines from Madavara
- Purple Line: ride the Green Line south to Majestic (Nadaprabhu Kempegowda station) and change for MG Road, Indiranagar, Whitefield and Mysuru Road.
- Yellow Line: stay on the Green Line to RV Road and change for BTM Layout, Silk Board and Electronic City.
- Yeshwanthpur railway station: get off at Yeshwanthpur on the Green Line, close to the railway station.
- KSR Bengaluru railway station: get off at Majestic and walk to the railway station.
Nearby landmarks
- BIEC: a large exhibition and conference venue next to the station, which hosts major trade fairs.
- Tumakuru Road (NH 48): the main road towards Nelamangala and Tumakuru.
- NICE Road junction: the peripheral road linking Tumakuru Road with Mysuru Road and Hosur Road.
- Peenya Industrial Area: one of Bengaluru’s largest industrial zones, a few stops south.
- Jalahalli and Dasarahalli: older residential and industrial areas along the line.
Homes and land near Madavara metro
Madavara is on the north-western edge of the city, where the city meets the Nelamangala belt. The area has a mix of apartment projects, plotted layouts, warehouses and industrial units.
- Close to the station: Madavara, Madanayakanahalli and Chikkabidarakallu.
- Along the line: Manjunathanagar, Nagasandra, Dasarahalli and Jalahalli.
- Further out: Makali, Dasanapura and Nelamangala, along Tumakuru Road.
- Who rents here: people working in Peenya and the Tumakuru Road industrial belt, warehouse staff, and families who want lower rents with a direct metro link to Majestic.
The metro now gives this corridor a direct link to Yeshwanthpur and Majestic. The proposed Tumakuru extension is still at the DPR stage: in May 2026, BMRCL submitted a report for a 60 km line via Nelamangala and Dobbspet, with costs estimated at about ₹17,785–19,361 crore depending on the funding model. It has not been approved for construction, so do not base a purchase on it.
Before you rent or buy near Madavara
- Check who governs the land. Areas near the city edge can fall under a Greater Bengaluru Authority city corporation, a gram panchayat or another body. Find out who issues the khata and collects tax.
- Check the land records. For plots and houses, check the RTC on Bhoomi, the khata, the conversion order (from agricultural use) and the encumbrance certificate.
- Check layout approval. Ask for the approved layout plan from the planning authority for the area. Avoid plots in unapproved layouts.
- Check RERA for new projects. Look up any new apartment or plotted project on the Karnataka RERA website before you book.
- Check the guideline value. Stamp duty in Karnataka is charged on the deal value or the guideline value, whichever is higher.
- Put the lease in writing. Sign a rent agreement with the rent, deposit, notice period and maintenance clearly listed.
Read our guides to the Bangalore metro map, Bhoomi Karnataka RTC, guideline value in Bangalore, stamp duty in Karnataka, Karnataka RERA, the encumbrance certificate, the plot buying checklist, the rent agreement format and checking property documents before buying. For the other end of the city, see our Kengeri metro station guide.
Frequently asked questions
Which line is Madavara metro station on?
It is the northern terminal of the Green Line of Namma Metro, which runs from Madavara to Silk Institute through Yeshwanthpur and Majestic.
When did Madavara metro station open?
Commercial service began on 7 November 2024, when the Green Line was extended about 3.14 km from Nagasandra to Madavara.
Is Madavara the same as the BIEC metro station?
Yes. The station was planned under the name BIEC, after the Bangalore International Exhibition Centre next to it, and opened as Madavara.
How do I reach Majestic from Madavara?
Take any train from Madavara. All trains run south towards Silk Institute and stop at Majestic, where you can change to the Purple Line.
What are the first and last train times at Madavara?
At the opening in November 2024, BMRCL said trains would run from 5 AM to 11 PM on this stretch, with later starts on Sundays. Check the Namma Metro app for the current timetable.
Will Namma Metro be extended from Madavara to Tumakuru?
It is only a proposal for now. A detailed project report for a 60 km line via Nelamangala and Dobbspet was submitted to the Karnataka government in May 2026, as reported. It still needs approvals and funding.
What is the metro fare from Madavara?
Namma Metro fares are ₹10 to ₹90 depending on distance. The 5% hike planned for February 2026 is on hold, so check the exact fare on the Namma Metro app.
Platforms, exits, parking, timings and fares are set by Bangalore Metro Rail Corporation Limited (BMRCL) and can change, and future lines depend on approvals. Check the BMRCL website or the Namma Metro app before you travel, and check the land records, layout approval, guideline value and RERA record before any property decision. This guide is general information, not investment advice. Sources: Bangalore Metro Rail Corporation Limited (english.bmrc.co.in); reports on the Nagasandra–Madavara opening (November 2024); reports on the February 2026 fare revision being put on hold and the July 2026 fare formula review; reports on the Madavara–Tumakuru DPR (May 2026); public station guides for Madavara.
Related guides
City & Locality GuidesNagar Nigam Guide: Meaning, Services and Official City Websites
City & Locality GuidesHMDA Hyderabad 2026: Jurisdiction, Layout Approval, LRS and Auctions
City & Locality GuidesCMDA Chennai 2026: Planning Permission, Approved Layouts and ExpansionNew properties in Lucknow
₹3.27 croreEkana Ontario Duplex ApartmentGomti Nagar Ext., Lucknow
₹1.31 croreArdia Neo Downtown LucknowGomti Nagar Ext., Lucknow




